| 2 | 1/1 | 返回列表 |
| 查看: 160 | 回復(fù): 1 | ||
| 本帖產(chǎn)生 1 個 ,點擊這里進(jìn)行查看 | ||
[求助]
請求幫助查一下一篇論文的ISTP、EI檢索號
|
||
|
有一篇文章,名稱是:Connections Checks of Pipe-laying Barge Stinger System under Complex Loading Conditions 關(guān)鍵字:Stinger System; Connection Check; RAO; Pipe-laying Barge 哪位蟲友幫助給查詢一下是否該文被檢索? 非常感謝!剛剛登陸的新蟲,沒有那么多金幣,還請諒解哈! |
版主 (文學(xué)泰斗)
風(fēng)雪
|
EI檢索: Accession number: 20134316887665 Title: Connections checks of pipe-laying barge stinger system under complex loading conditions Authors: Zhao, Tian Feng1 Email author zhaotianfeng@sina.com; Qi, Jin Long2 Email author qijinlong@mail.cooec.com.cn; Zhou, Huan Hong1 Email author xjicefox@126.com; Duan, Meng Lan1 Email author mlduan@cup.edu.cn Author affiliation: 1 Offshore Oil/Gas Research Center, China University of Petroleum, Beijing 102249, China 2 Offshore Oil Engineering Ltd, Tanggu, Tianjin 300452, China Source title: Applied Mechanics and Materials Abbreviated source title: Appl. Mech. Mater. Volume: 365-366 Monograph title: Machine Design and Manufacturing Engineering II Issue date: 2013 Publication year: 2013 Pages: 241-244 Language: English ISSN: 16609336 E-ISSN: 16627482 ISBN-13: 9783037857816 Document type: Conference article (CA) Conference name: 2013 2nd International Conference on Machine Design and Manufacturing Engineering, ICMDME 2013 Conference date: May 1, 2013 - May 2, 2013 Conference location: Jeju Island, Korea, Republic of Conference code: 100289 Sponsor: Trans Tech Publications Publisher: Trans Tech Publications Ltd, Kreuzstrasse 10, Zurich-Durnten, CH-8635, Switzerland Abstract: Fixed stinger system hanging in the stern to implement pipeline S-lay mainly includes an A-frame, a stinger hitch section, a stinger tail section, a knee-brace and a knee-brace hitch. Expect the functional loads the stinger system may suffer environmental loads in construction area and also the inertia loads induced by barge movements. Contrasting to the design of stinger truss, connection mechanism design becomes more complicated for the unknown loads shared during the laying cases or the survival case of the barge. In this paper a set of analytical approach for connection mechanism design are proposed and demonstrated for specific operating conditions. In this approach, structural response analysis were carried out firstly using a beam-element truss model to which pipelay functional loads, environmental loads and inertia loads had been applied and the loads undertook by stinger connections were extracted. Next other connection models constructed by cell grids were enabled to predict the responses of connections under those loads extracted from the analysis results of the first step. The analysis example of this paper confirms that based on this approach more careful strength or fatigue check had been realized for the connections of fixed stinger. © (2013) Trans Tech Publications, Switzerland. Number of references: 5 Main heading: Barges Controlled terms: Industrial engineering - Machine design - Trusses Uncontrolled terms: Analytical approach - Connection check - Connection mechanism design - Environmental loads - Operating condition - RAO - Stinger system - Structural response analysis Classification code: 408.2Structural Members and Shapes - 601Mechanical Design - 674Small Craft and Other Marine Craft - 912.1Industrial Engineering DOI: 10.4028/www.scientific.net/AMM.365-366.241 Database: Compendex Compilation and indexing terms, © 2017 Elsevier Inc. Full-text and Local Holdings Links |
| 2 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 303求調(diào)劑 +3 | 睿08 2026-03-17 | 3/150 |
|
|---|---|---|---|---|
|
[考研] 070300化學(xué)319求調(diào)劑 +3 | 錦鯉0909 2026-03-17 | 3/150 |
|
|
[考研] 材料與化工求調(diào)劑 +4 | 為學(xué)666 2026-03-16 | 4/200 |
|
|
[考研] 285化工學(xué)碩求調(diào)劑(081700) +9 | 柴郡貓_ 2026-03-12 | 9/450 |
|
|
[基金申請]
今年的國基金是打分制嗎?
50+3
|
zhanghaozhu 2026-03-14 | 3/150 |
|
|
[考研] 304求調(diào)劑 +4 | ahbd 2026-03-14 | 4/200 |
|
|
[考研] 085600調(diào)劑 +5 | 漾漾123sun 2026-03-12 | 6/300 |
|
|
[考研] 085600材料與化工 求調(diào)劑 +13 | enenenhui 2026-03-13 | 14/700 |
|
|
[考研] 材料與化工一志愿南昌大學(xué)327求調(diào)劑推薦 +7 | Ncdx123456 2026-03-13 | 8/400 |
|
|
[考研] 326求調(diào)劑 +4 | 上岸的小葡 2026-03-15 | 5/250 |
|
|
[考研] 265求調(diào)劑 +4 | 威化餅07 2026-03-12 | 4/200 |
|
|
[基金申請] 現(xiàn)在如何回避去年的某一個專家,不知道名字 +3 | zk200107 2026-03-12 | 6/300 |
|
|
[考研] 328求調(diào)劑 +3 | 5201314Lsy! 2026-03-13 | 6/300 |
|
|
[考研] 材料080500調(diào)劑求收留 +3 | 一顆meteor 2026-03-13 | 3/150 |
|
|
[考研] 331求調(diào)劑(0703有機化學(xué) +5 | ZY-05 2026-03-13 | 6/300 |
|
|
[考研] 330求調(diào)劑 +3 | ?醬給調(diào)劑跪了 2026-03-13 | 3/150 |
|
|
[考研] 一志愿中科院,化學(xué)方向,295求調(diào)劑 +4 | 一氧二氮 2026-03-11 | 4/200 |
|
|
[考研] 【0856】化學(xué)工程(085602)313 分,本科學(xué)科評估A類院;瘜W(xué)工程與工藝,誠求調(diào)劑 +7 | 小劉快快上岸 2026-03-11 | 7/350 |
|
|
[考研] 0817化學(xué)工程與技術(shù)考研312分調(diào)劑 +3 | T123 tt 2026-03-12 | 3/150 |
|
|
[考研] 求調(diào)劑 資源與環(huán)境 285 +3 | 未名考生 2026-03-10 | 3/150 |
|