| 5 | 1/1 | 返回列表 |
| 查看: 1737 | 回復(fù): 8 | ||
| 本帖產(chǎn)生 1 個(gè) 翻譯EPI ,點(diǎn)擊這里進(jìn)行查看 | ||
| 當(dāng)前只顯示滿足指定條件的回帖,點(diǎn)擊這里查看本話題的所有回帖 | ||
十一月臭盆新蟲 (初入文壇)
|
[求助]
求英譯漢翻譯 急用的
|
|
|
7. Review on the design and construction of a large wastewater treatment plant Abstract: The largest municipal wastewater treatment plant (WWIP) in the Netherlands is the WWTP Houtrust in The Hague. This plant with a capacity of 1 100 000 population equivalents will occupy an area of merely five ha. Due to the limited area the plant is built in three successive phases as an extension of the existing primary sedimentation plant. This paper focuses on the design and construction of the secondary wastewater treatment and sludge handling. The UNOX system, developed by Union Carbide and later by Linde, one of the advanced treatment systems with adequate full scale experience, was chosen. This system uses pure oxygen to aerate and therefore operates on activated sludge with extremely good settling properties. Construction of the extensions of the existing sedimentation plant with the UNOX system started in 1986 and was expected to be completed at the end of 1988. 8. Foundation construction within wastewater-treatment plant Abstract: The entire foundation design and construction histories of a project built inside an existing wastewater-treatment plant are described. The foundation type decision process, based on the subsurface conditions, the existing structure's performance, and the proposed facility's constraints are outlined. In addition, the foundation construction histories, including foundation specifications, construction dewatering and monitoring, pile-load-test results and production pile driving records, are summarized. Weak soils existed to significant depths over the entire site as did a high ground-water table. Since the elevations of the bases of the structures varied significantly, it was also cost effective to vary foundation type depending upon the estimated load-carrying capacity of the soil at the base of the proposed foundations. Consideration also had to be given to the possibility of detrimental total and differential settlements as a result of dewatering as well as differences in foundation type between existing and proposed structures. This project demonstrated that a properly designed and adequately executed foundation construction program can effectively eliminate the need for expensive underpinning of nearby existing facilities. And, pile load test is a reliable tool to establish the driving criteria, to confirm the design assumptions, and to economize the required pile length. (3 refs.) 9. Yannawa wastewater treatment plant (Bangkok, Thailand): Design, construction and operation Abstract: Yannawa. Wastewater Treatment plant (Phase 1) serves a population equivalent of 500,000 and is located on a restricted site within the city of Bangkok, Thailand. Secondary treatment is based on the CASS? sequencing batch reactor (SBR) process and the plant is one of the largest multi-storey SBRs in the world. The limitation of available site area, the ground conditions and the characteristics of the wastewater to be treated set a series of challenges for the designers, contractors and commissioning and operational staff. This paper briefly describes the collection system, the process selection and the treatment streams of the wastewater treatment plant. The SBR secondary treatment plant is described in more detail. The problems that arose during commissioning and operation and the solutions made possible by the use of an SBR type of process are discussed. Details of plant performance during performance testing and during the first three years of plant operation are provided. ? Earth Tech Engineering Ltd 2004. (6 refs.) 真的很著急 那位高手能幫幫忙啊 謝謝了 [ Last edited by 十一月臭盆 on 2012-4-14 at 11:20 ] |
新蟲 (初入文壇)
銀蟲 (正式寫手)
|
7.《污水處理廠的設(shè)計(jì)結(jié)構(gòu)研究進(jìn)展》 摘要:荷蘭最大的城市污水處理廠是位于海牙的WWTP Houtrust.該廠具有處理相當(dāng)于100000人口排放廢水的能力,占地僅5公頃。受地域限制,該廠僅建有三級(jí)連續(xù)的處理設(shè)施,用作現(xiàn)存的污水初期沉降處理廠的后續(xù)處理設(shè)施。本文主要敘述2級(jí)污水及淤泥處理設(shè)施的設(shè)計(jì)與構(gòu)造。使用Union Carbide及后來的Linde公司開發(fā)的一種經(jīng)過了充分實(shí)踐的先進(jìn)處理系統(tǒng)——UNOX系統(tǒng)。該系統(tǒng)通過加入純氧,使活性污泥具有相當(dāng)不錯(cuò)的沉淀性質(zhì)。1986年開始建造使用該UNOX系統(tǒng)的污水沉降處理廠后續(xù)處理設(shè)施,并預(yù)計(jì)到1988年底完成。 |

新蟲 (初入文壇)
銀蟲 (正式寫手)
|
8.《污水處理廠的基礎(chǔ)結(jié)構(gòu)》 摘要:本文總結(jié)了現(xiàn)存污水處理廠建造工程中全部的基礎(chǔ)設(shè)計(jì)及構(gòu)造的歷史。概述了基于地表?xiàng)l件、現(xiàn)存結(jié)構(gòu)性能以及相關(guān)設(shè)施局限性的污水處理設(shè)施結(jié)構(gòu)類型的設(shè)計(jì)方案。同時(shí)也概述了包括基礎(chǔ)規(guī)格、施工脫水與監(jiān)測、試樁結(jié)果以及生產(chǎn)樁記錄的相關(guān)基礎(chǔ)構(gòu)造歷史。整個(gè)廠區(qū)一定深度的軟土壤存在常常說明該區(qū)域地下水位高。由于建筑結(jié)構(gòu)的基底高度的顯著改變,使得依賴于土壤負(fù)載能力的擬定基礎(chǔ)結(jié)構(gòu)基底的結(jié)構(gòu)類型需要改變,這種改變是相當(dāng)耗財(cái)耗力的。由于脫水以及現(xiàn)存與擬定的基礎(chǔ)結(jié)構(gòu)類型的不同,不得不考慮潛在的各種危害和差異沉降。通過對(duì)基礎(chǔ)結(jié)構(gòu)合理地設(shè)計(jì)及恰當(dāng)?shù)貙?shí)施,可證明該工程能有效地避免使用昂貴的支柱去支撐現(xiàn)存設(shè)備。此外,試樁是建立此類運(yùn)行標(biāo)準(zhǔn)的一種切實(shí)可行的方法,可以用于判斷相關(guān)設(shè)計(jì)設(shè)想的可行性,且節(jié)省所需樁的長度。(參考3) |

| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 一志愿天大材料與化工(085600)總分338 +3 | 蔡大美女 2026-03-13 | 3/150 |
|
|---|---|---|---|---|
|
[考研] 344求調(diào)劑 +5 | knight344 2026-03-16 | 6/300 |
|
|
[考研] 0817 化學(xué)工程 299分求調(diào)劑 有科研經(jīng)歷 有二區(qū)文章 +7 | rare12345 2026-03-18 | 7/350 |
|
|
[考研] 281求調(diào)劑(0805) +5 | 煙汐憶海 2026-03-16 | 13/650 |
|
|
[考研] 能源材料化學(xué)課題組招收碩士研究生8-10名 +4 | 脫穎而出 2026-03-16 | 9/450 |
|
|
[考研] 一志愿天津大學(xué)化學(xué)工藝專業(yè)(081702)315分求調(diào)劑 +9 | yangfz 2026-03-17 | 9/450 |
|
|
[考研] 299求調(diào)劑 +5 | △小透明* 2026-03-17 | 5/250 |
|
|
[考研] 303求調(diào)劑 +4 | 睿08 2026-03-17 | 6/300 |
|
|
[考研] 生物學(xué)071000 329分求調(diào)劑 +3 | 我愛生物生物愛?/a> 2026-03-17 | 3/150 |
|
|
[考研] 302求調(diào)劑 +9 | 負(fù)心者當(dāng)誅 2026-03-11 | 9/450 |
|
|
[考研] 332求調(diào)劑 +6 | Zz版 2026-03-13 | 6/300 |
|
|
[考研] 一志愿,福州大學(xué)材料專碩339分求調(diào)劑 +3 | 木子momo青爭 2026-03-15 | 3/150 |
|
|
[考研]
|
zhouzhen654 2026-03-16 | 3/150 |
|
|
[考研] 0703一志愿211 285分求調(diào)劑 +5 | ly3471z 2026-03-13 | 5/250 |
|
|
[考研] 中科院材料273求調(diào)劑 +4 | yzydy 2026-03-15 | 4/200 |
|
|
[考研] 297求調(diào)劑 +4 | 學(xué)海漂泊 2026-03-13 | 4/200 |
|
|
[考研] 281求調(diào)劑 +9 | Koxui 2026-03-12 | 11/550 |
|
|
[考研] 307求調(diào)劑 +5 | 超級(jí)伊昂大王 2026-03-12 | 5/250 |
|
|
[考研] 求調(diào)劑 +3 | 程雨杭 2026-03-12 | 3/150 |
|
|
[考研] 328化工專碩求調(diào)劑 +4 | 。,。,。,。i 2026-03-12 | 4/200 |
|