| 5 | 1/1 | 返回列表 |
| 查看: 797 | 回復(fù): 4 | ||
| 當(dāng)前只顯示滿足指定條件的回帖,點(diǎn)擊這里查看本話題的所有回帖 | ||
lijunxue08金蟲 (小有名氣)
|
[求助]
求助翻譯下面的內(nèi)容
|
|
|
The GPS health monitoring system of Zhujiang Huangpu Bridge in China for the case study bridge is discussed in this section. This bridge is composed of a 705 m-long cable-stayed bridge and an 1108 m-long cable-suspended bridge. The width of deck and the height of towers for the Bridge are 34?5 and 195?476 m, respectively.There were 14 GPS units installed on the two bridges after August 15, 2009, including 13 rover stations and 1 base station as shown in Fig. 1. The distance between base station and point (107) is 1.00 and 1.50 km from point (101) according to Fig. 1.The reference station refreshes the RTK correction messages for the GPS monitoring stations with a frequency of 1 Hz via the optical fibre communication system. LEICA Geo-systems antennas and dualfrequency GPS receivers were used to observe the GPS satellite signals; the satellite elevation cut-off angle is 13u, at least nine satellites. The observations were split into single hour observations for the processing purposes. The data collected were mixed with that generated by the receivers’ own oscillators, and then LEICA Spider 2?1 RTK software was used to process RTK GPS data. The data collected are processed coordinates in World Geodetic System (WGS-84) and converted to the local coordinate system by the coordinate transformation, Ogundipe et al. [21] and Elsheimy [6] summarised the coordinate transformation system which was used in this case of study. A local bridge coordinate system was established to be used in the analysis and the evaluation of the observation data.The X data represent the relative displacement changes along the longitudinal direction of the bridge; the Y data represent the relative displacement changes along the transverse direction of the bridge while the Z data represent the relative displacement changes along the altitude direction of the bridge [11]. The outputs from GPS monitoring stations include monitoring point number and RTK GPS three-dimensional coordinates,GPS time, satellite status data, GPS receiver status data,and so on, and the raw GPS outputs, if required as shown in Fig. 2. The resonant frequency of the bridge is considered a very important parameter in the bridge structural and safety analyses. The relative displacement changes of the bridge deck will be in millimetres. |
木蟲 (正式寫手)
金蟲 (小有名氣)
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 環(huán)境工程 085701,267求調(diào)劑 +7 | minht 2026-03-29 | 7/350 |
|
|---|---|---|---|---|
|
[考研] 材料與化工(0856)304求B區(qū)調(diào)劑 +3 | 邱gl 2026-03-30 | 7/350 |
|
|
[考研] 309求調(diào)劑 +15 | 誰不是少年 2026-03-29 | 15/750 |
|
|
[考研] 求調(diào)劑 +7 | 研研,接電話 2026-03-24 | 8/400 |
|
|
[考研] 南京大學(xué)化學(xué)調(diào)劑 +10 | 景隨風(fēng) 2026-03-29 | 15/750 |
|
|
[考研] 一志愿211,335分,0856,求調(diào)劑院校和導(dǎo)師 +7 | 傾____蕭 2026-03-27 | 8/400 |
|
|
[考研] 343求調(diào)劑085601 +3 | 要努力學(xué)習(xí)x 2026-03-29 | 3/150 |
|
|
[考研] 0856求調(diào)劑 +13 | zhn03 2026-03-25 | 14/700 |
|
|
[考研] 343求調(diào)劑 +5 | 愛羈絆 2026-03-28 | 5/250 |
|
|
[考研] 304求調(diào)劑 +6 | 曼殊2266 2026-03-27 | 6/300 |
|
|
[考研] 材料與化工(0856)304求B區(qū)調(diào)劑 +8 | 邱gl 2026-03-27 | 8/400 |
|
|
[考研] 283求調(diào)劑 +7 | A child 2026-03-28 | 7/350 |
|
|
[考研] 材料277求調(diào)劑 +7 | min3 2026-03-24 | 7/350 |
|
|
[考研] 086502化學(xué)工程342求調(diào)劑 +6 | 阿姨復(fù)古不過 2026-03-27 | 6/300 |
|
|
[考研] 305求調(diào)劑 +5 | 哇盧卡庫 2026-03-26 | 5/250 |
|
|
[碩博家園] 北京林業(yè)大學(xué)碩導(dǎo)招生廣告 +6 | kongweilin 2026-03-26 | 8/400 |
|
|
[考研] 求調(diào)劑 一志愿 本科 北科大 化學(xué) 343 +6 | 13831862839 2026-03-24 | 7/350 |
|
|
[考研]
|
平樂樂樂 2026-03-26 | 4/200 |
|
|
[考研] 290分調(diào)劑求助 +3 | 吉祥止止陳 2026-03-25 | 3/150 |
|
|
[考研] 一志愿武理085500機(jī)械專業(yè)總分300求調(diào)劑 +3 | an10101 2026-03-24 | 7/350 |
|