| 5 | 1/1 | 返回列表 |
| 查看: 393 | 回復(fù): 3 | ||
| 本帖產(chǎn)生 1 個 ,點擊這里進(jìn)行查看 | ||
| 當(dāng)前只顯示滿足指定條件的回帖,點擊這里查看本話題的所有回帖 | ||
[求助]
求助查詢一篇文章是否被EI檢索
|
||
|
論文名稱:schedule management of airport flying area construction based on bim 作者姓名:zhang yonzi,cai liangcai,fan min 會議名稱:the 4th international conference on civil engineering,architecture and building material [ 發(fā)自手機版 http://www.gaoyang168.com/3g ] |
版主 (知名作家)
命中※注定
|
Accession number: 20143218035152 Title: Schedule management of airport flying area construction based on BIM Authors: Zhang, Yin Zi1 Email author zhangyinzi@hotmail.com; Cai, Liang Cai1; Fan, Min1 Email author minnfa@163.com Author affiliation: 1 Department of Airport Construction, Air Force Engineering University, 710038, China Source title: Applied Mechanics and Materials Abbreviated source title: Appl. Mech. Mater. Volume: 584-586 Monograph title: Architecture, Building Materials and Engineering Management IV Issue date: 2014 Publication year: 2014 Pages: 2653-2658 Language: English ISSN: 16609336 E-ISSN: 16627482 ISBN-13: 9783038351665 Document type: Conference article (CA) Conference name: 4th International Conference on Civil Engineering, Architecture and Building Materials, CEABM 2014 Conference date: May 24, 2014 - May 25, 2014 Conference location: Haikou, China Conference code: 106661 Publisher: Trans Tech Publications Ltd Abstract: Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D, Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality. © (2014) Trans Tech Publications, Switzerland. Number of references: 5 Main heading: Airports Controlled terms: Architectural design - Building materials - Complex networks - Network architecture - Trenching Uncontrolled terms: BIM technologies - Complex construction - Management efficiency - Management quality - Real-time updates - Schedule management - Traditional constructions - Underground pipes Classification code: 402 Buildings and Towers - 411 Bituminous Materials - 412 Concrete - 413 Insulating Materials - 414 Masonry Materials - 415 Metals, Plastics, Wood and Other Structural Materials - 431.4 Airports - 619.1 Pipe, Piping and Pipelines - 722 Computer Systems and Equipment DOI: 10.4028/www.scientific.net/AMM.584-586.2653 Database: Compendex Compilation and indexing terms, © 2015 Elsevier Inc. |

| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 085602 307分 求調(diào)劑 +9 | 不知道叫什么! 2026-03-26 | 9/450 |
|
|---|---|---|---|---|
|
[考研] 308求調(diào)劑 +11 | 墨墨漠 2026-03-25 | 11/550 |
|
|
[考研] 307分求調(diào)劑 +6 | (o~o) 2026-03-31 | 6/300 |
|
|
[考研] 生醫(yī)工0831調(diào)劑求推薦 +4 | 小熊睿睿_s 2026-03-27 | 6/300 |
|
|
[考研] 085600 材料與化工 329分求調(diào)劑 +20 | Mr. Z 2026-03-25 | 21/1050 |
|
|
[考研] 考研調(diào)劑求助 +7 | 13287130938 2026-03-31 | 7/350 |
|
|
[考研] 土木304求調(diào)劑 +3 | 頂級擦擦 2026-03-31 | 3/150 |
|
|
[考研] 0856調(diào)劑 +6 | 曲聽筠 2026-03-30 | 6/300 |
|
|
[考研] 317求調(diào)劑 +8 | 十閑wx 2026-03-24 | 8/400 |
|
|
[考研] 生物學(xué)學(xué)碩,一志愿湖南大學(xué),初試成績338 +7 | YYYYYNNNNN 2026-03-26 | 9/450 |
|
|
[考研] 296求調(diào)劑 +10 | 彼岸t 2026-03-29 | 10/500 |
|
|
[考研] 求調(diào)劑,一志愿 南京航空航天大學(xué)大學(xué) ,080500材料科學(xué)與工程學(xué)碩 +6 | @taotao 2026-03-26 | 7/350 |
|
|
[考研] 291求調(diào)劑 +5 | Y-cap 2026-03-29 | 6/300 |
|
|
[考研] 308求調(diào)劑 +7 | 墨墨漠 2026-03-27 | 7/350 |
|
|
[考研] 330一志愿中國海洋大學(xué) 化學(xué)工程 085602 有讀博意愿 求調(diào)劑 +3 | wywy.. 2026-03-27 | 4/200 |
|
|
[考研] 285求調(diào)劑 +4 | AZMK 2026-03-27 | 7/350 |
|
|
[考研] 0856調(diào)劑 +5 | 求求讓我有書讀?/a> 2026-03-26 | 6/300 |
|
|
[考研] 085600,材料與化工321分,求調(diào)劑 +9 | 大饞小子 2026-03-27 | 9/450 |
|
|
[考研] 314求調(diào)劑 +3 | 溪云珂 2026-03-26 | 3/150 |
|
|
[考研] 292求調(diào)劑 +4 | 求求了收下我吧?/a> 2026-03-26 | 4/200 |
|