| 5 | 1/1 | 返回列表 |
| 查看: 741 | 回復(fù): 4 | ||
elitefrank木蟲 (正式寫手)
|
[求助]
請求幫助查詢?nèi)恼碌腅I/SCI/ISTP收錄情況,謝謝。 已有2人參與
|
|
1.The petrochemical park fire safety planning study based on fire risk analysis,2012 International Conference on Energy and Environmental Protection 2012.8 2. Petrochemical plant multi-objective and multi-stage fire emergency management technology system based on the fire risk prediction The 9th Asia-Oceania Symposium on Fire Science and Technology,Procedia Engineering 12/2013; 62:1104-1111. DOI: 10.1016/j.proeng.2013.08.167 2013.10 3. Fire risk forecast and early warning technology for large oil and gas storage & transport tank areas, Advanced Materials Research Vols.726-731(2013)P 4654-4659. 2013.8 |


至尊木蟲 (著名寫手)
珞喻山人
|
Accession number: 20122315089349 Title: The petrochemical park fire safety planning study based on fire risk analysis Authors: Liu, Xuanya1 Email author liuxuanya@tfri.com.cn Author affiliation: 1 Tianjin Fire Research Institute of MPS, Tianjin 300381, China Corresponding author: Liu, X. (liuxuanya@tfri.com.cn) Source title: Advanced Materials Research Abbreviated source title: Adv. Mater. Res. Volume: 518-523 Monograph title: Advances in Environmental Science and Engineering Issue date: 2012 Publication year: 2012 Pages: 1045-1051 Language: English ISSN: 10226680 ISBN-13: 9783037854167 Document type: Conference article (CA) Conference name: 1st International Conference on Energy and Environmental Protection, ICEEP 2012 Conference date: June 23, 2012 - June 24, 2012 Conference location: Hohhot, China Conference code: 89966 Publisher: Trans Tech Publications, P.O. Box 1254, Clausthal-Zellerfeld, D-38670, Germany Abstract: According to the chemical industrial parks current development trend in China, the fire risks, fire safety situations and the existing problems of petrochemical parks have been widely surveyed. And the main basic contents of chemical industrial parks fire safety planning are described in the paper. Through the researches on fire safety planning of chemical industry park and its evaluation system, based on the security planning of the chemical park, the fire safety planning methods and planning procedure to improve the petrochemical industrial park fire prevention levels are proposed on the basis of fire risk analysis. © (2012) Trans Tech Publications, Switzerland. Number of references: 15 Main heading: Parks Controlled terms: Chemical industry - Fireproofing - Fires - Petrochemicals Uncontrolled terms: Chemical industrial park - Chemical industry parks - Chemical park - Development trends - Evaluation system - Existing problems - Fire prevention - Fire risk analysis - Fire risks - Fire safety - Industrial parks - ITS evaluation - Planning procedure - Security planning Classification code: 403.2 Regional Planning and Development - 804.1 Organic Compounds - 805 Chemical Engineering, General - 914.2 Fires and Fire Protection DOI: 10.4028/www.scientific.net/AMR.518-523.1045 Database: Compendex |

至尊木蟲 (著名寫手)
珞喻山人

至尊木蟲 (著名寫手)
珞喻山人
|
Accession number: 20134116834456 Title: Fire risk forecast and early warning technology for large oil and gas storage & transport tank areas Authors: Liu, Xuan Ya1 Email author liuxuanya@tfri.com.cn; Wang, Xiao Zhou1 Email author wangxiaozhou@tfri.com.cn Author affiliation: 1 Tianjin Fire Research Institute of MPS, Tianjin, China Source title: Advanced Materials Research Abbreviated source title: Adv. Mater. Res. Volume: 726-731 Monograph title: Advances in Environmental Technologies Issue date: 2013 Publication year: 2013 Pages: 4654-4659 Language: English ISSN: 10226680 ISBN-13: 9783037857427 Document type: Conference article (CA) Conference name: 2013 2nd International Conference on Energy and Environmental Protection, ICEEP 2013 Conference date: April 19, 2013 - April 21, 2013 Conference location: Guilin, China Conference code: 99790 Publisher: Trans Tech Publications Ltd, Kreuzstrasse 10, Zurich-Durnten, CH-8635, Switzerland Abstract: According to the characteristics of the storage and transportation working functions in large oil and gas storage tank areas, based on the analysis of equipments' leakages, fires, explosion and other disaster scenes and accidents evolution model in the tank areas, the effect factors of the tanks area fire risk were studied. Combined with the analysis of key equipments and process fittings failure probabilities and tank fire-fighting equipments effectiveness, the fire and explosion accidents forecast analysis methods based on the dynamic monitoring technology were put forward. Through the analysis of the critical temperature, pressure, liquid level, gas concentration and other state parameters of the oil and gas storage tank equipments failure, using the advanced information technologies (GIS geographic information system, RS remote sensing and telemetry systems, etc.) and remote singles monitor technologies, the status parameters of dangerous materials and process equipments can be carried out with real time measurement and monitoring. © (2013) Trans Tech Publications, Switzerland. Number of references: 7 Main heading: Risk assessment Controlled terms: Equipment - Fires - Forecasting - Geographic information systems - Information technology - Risk perception - Tanks (containers) Uncontrolled terms: Critical temperatures - Fire and explosion accidents - Fire risk assessment - Fire risks - Real time measurements - Scenario analysis - Scene mode - Storage and transportations Classification code: 921 Mathematics - 914.2 Fires and Fire Protection - 914.1 Accidents and Accident Prevention - 903.3 Information Retrieval and Use - 903 Information Science - 901 Engineering Profession - 619.2 Tanks DOI: 10.4028/www.scientific.net/AMR.726-731.4654 Database: Compendex |

| 5 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 290求調(diào)劑 +6 | 孔志浩 2026-03-12 | 11/550 |
|
|---|---|---|---|---|
|
[考研] 材料專碩306英一數(shù)二 +6 | z1z2z3879 2026-03-16 | 8/400 |
|
|
[考研] 08工科 320總分 求調(diào)劑 +4 | 梨花珞晚風 2026-03-17 | 4/200 |
|
|
[考研] 302求調(diào)劑 +8 | 負心者當誅 2026-03-11 | 8/400 |
|
|
[考研] 328求調(diào)劑,英語六級551,有科研經(jīng)歷 +3 | 生物工程調(diào)劑 2026-03-16 | 4/200 |
|
|
[考研] 機械專碩325,尋找調(diào)劑院校 +3 | y9999 2026-03-15 | 5/250 |
|
|
[考研] 0703化學調(diào)劑 +6 | 妮妮ninicgb 2026-03-15 | 9/450 |
|
|
[考研] 0703 物理化學調(diào)劑 +3 | 我可以上岸的對?/a> 2026-03-13 | 5/250 |
|
|
[考研] 0703化學調(diào)劑 290分有科研經(jīng)歷,論文在投 +7 | 膩膩gk 2026-03-14 | 7/350 |
|
|
[考研] 308求調(diào)劑 +3 | 是Lupa啊 2026-03-16 | 3/150 |
|
|
[考研] 070305求調(diào)劑 +3 | mlpqaz03 2026-03-14 | 4/200 |
|
|
[考研] 328求調(diào)劑 +3 | 5201314Lsy! 2026-03-13 | 6/300 |
|
|
[基金申請]
有必要更換申報口嗎
20+3
|
fannyamoy 2026-03-11 | 3/150 |
|
|
[考研] 材料與化工(0856)304求B區(qū)調(diào)劑 +6 | 邱gl 2026-03-12 | 7/350 |
|
|
[考研] 304求調(diào)劑 +7 | 7712b 2026-03-13 | 7/350 |
|
|
[考研] 土木第一志愿276求調(diào)劑,科研和技能十分豐富,求新興方向的導(dǎo)師收留 +3 | 土木小天才 2026-03-12 | 3/150 |
|
|
[考研] 一志愿山大07化學 332分 四六級已過 本科山東雙非 求調(diào)劑! +3 | 不想理你 2026-03-12 | 3/150 |
|
|
[考研] 求調(diào)劑 資源與環(huán)境 285 +3 | 未名考生 2026-03-10 | 3/150 |
|
|
[考研] 321求調(diào)劑(食品/專碩) +3 | xc321 2026-03-12 | 6/300 |
|
|
[考博] 2026年博士申請 +3 | QwQwQW10 2026-03-11 | 3/150 |
|