| 24小時(shí)熱門(mén)版塊排行榜 |
| 3 | 1/1 | 返回列表 |
| 查看: 303 | 回復(fù): 2 | |||
| 本帖產(chǎn)生 1 個(gè) ,點(diǎn)擊這里進(jìn)行查看 | |||
aswanwang新蟲(chóng) (初入文壇)
|
[求助]
幫忙查下《單線鐵路隧道水平巖層施工技術(shù)》是否被EI收錄?新手出道,不甚感激
|
||
| 麻煩各位,幫忙看看《單線鐵路隧道水平巖層施工技術(shù)》,現(xiàn)代隧道技術(shù),2014(6),是否被EI收錄,收錄編號(hào)是多少?新手出道,不甚感激 |
版主 (文學(xué)泰斗)
風(fēng)雪
|
Accession number: 20151200672607 Title: Construction techniques for a single-track railway tunnel in a horizontal stratum Authors: Chen, Wang1 Author affiliation: 1China Railway Tunnel Group Erchu Co. Ltd., Yanjiao, China Corresponding author: Chen, Wang Source title: Modern Tunnelling Technology Abbreviated source title: Mod. Tunn. Technol. Volume: 51 Issue: 6 Issue date: December 1, 2014 Publication year: 2014 Pages: 142-147 Language: Chinese ISSN: 10096582 Document type: Journal article (JA) Publisher: Editorial By Modern Tunnelling Technology, China Abstract: In the South Luliangshan tunnel, the surrounding rock at the entrance of the #2 inclined shaft is mainly composed of horizontally layered mudstone, marlstone, and limestone with developed bedding and joint fissures, which are inclined to result in rock falls, chipping, and rock collapse at the arch after blasting, causing difficulties in terms of rapid excavation, cost control, and safety risks. In this paper, considering the excavation method, advance reinforcement, controlled blasting, primary support, monitoring, and measurement, major construction methods, measures, and techniques are presented for the single-track railway tunnel in horizontal stratum, such as the short bench method, advance condulet grouting, slight controlled blasting, hollow grouting anchor support for the arch, geological advance prediction, and strengthened construction monitoring. ©, 2014, Editorial Office of "Modern Tunnelling Technology". All right reserved. Number of references: 6 Main heading: Railroad tunnels Controlled terms: Arches - Blasting - Concrete construction - Excavation - Grouting - Mortar - Railroad transportation - Railroads - Reinforcement - Rock bursts - Transportation - Tunnels Uncontrolled terms: Construction method - Construction monitoring - Construction technique - Controlled blasting - Excavation methods - Horizontal stratum - Rapid construction - Single track railway Classification code: 401.1 Bridges - 401.2 Tunnels and Tunneling - 405 Construction Equipment and Methods; Surveying - 405.2 Construction Methods - 412 Concrete - 414.3 Mortar (Before 1993, use code 412) - 415 Metals, Plastics, Wood and Other Structural Materials - 431 Air Transportation - 432 Highway Transportation - 433 Railroad Transportation - 433.1 Railroad Transportation, General - 434 Waterway Transportation - 502.1 Mine and Quarry Operations - 951 Materials Science DOI: 10.13807/j.cnki.mtt.2014.06.023 Database: Compendex Compilation and indexing terms, © 2015 Elsevier Inc. Full-text and Local Holdings Links Tools in Scopus Cited by: This article has been cited 1 time in Scopus since 1996. Liu, Q.; Tan, Z.; Cheng, L.; Zou, X. Field tests regaring the uncertainty of the calculation model for soil filling pressure on open-cut tunnels (2015) Modern Tunnelling Technology -------------------------------------------------------------------------------- Author details: View Author Details in Scopus. Chen, W. Learn more about Scopus Add a tag Add a tag scopePublicPrivateMy InstitutionLogin for groups Add a tag text box -------------------------------------------------------------------------------- -------------------------------------------------------------------------------- |
版主 (文學(xué)泰斗)
風(fēng)雪
| 3 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|