| 5 | 1/1 | 返回列表 |
| 查看: 1750 | 回復: 8 | |||
| 本帖產(chǎn)生 1 個 翻譯EPI ,點擊這里進行查看 | |||
| 當前只顯示滿足指定條件的回帖,點擊這里查看本話題的所有回帖 | |||
[求助]
求英譯漢翻譯 急用的
|
|||
|
7. Review on the design and construction of a large wastewater treatment plant Abstract: The largest municipal wastewater treatment plant (WWIP) in the Netherlands is the WWTP Houtrust in The Hague. This plant with a capacity of 1 100 000 population equivalents will occupy an area of merely five ha. Due to the limited area the plant is built in three successive phases as an extension of the existing primary sedimentation plant. This paper focuses on the design and construction of the secondary wastewater treatment and sludge handling. The UNOX system, developed by Union Carbide and later by Linde, one of the advanced treatment systems with adequate full scale experience, was chosen. This system uses pure oxygen to aerate and therefore operates on activated sludge with extremely good settling properties. Construction of the extensions of the existing sedimentation plant with the UNOX system started in 1986 and was expected to be completed at the end of 1988. 8. Foundation construction within wastewater-treatment plant Abstract: The entire foundation design and construction histories of a project built inside an existing wastewater-treatment plant are described. The foundation type decision process, based on the subsurface conditions, the existing structure's performance, and the proposed facility's constraints are outlined. In addition, the foundation construction histories, including foundation specifications, construction dewatering and monitoring, pile-load-test results and production pile driving records, are summarized. Weak soils existed to significant depths over the entire site as did a high ground-water table. Since the elevations of the bases of the structures varied significantly, it was also cost effective to vary foundation type depending upon the estimated load-carrying capacity of the soil at the base of the proposed foundations. Consideration also had to be given to the possibility of detrimental total and differential settlements as a result of dewatering as well as differences in foundation type between existing and proposed structures. This project demonstrated that a properly designed and adequately executed foundation construction program can effectively eliminate the need for expensive underpinning of nearby existing facilities. And, pile load test is a reliable tool to establish the driving criteria, to confirm the design assumptions, and to economize the required pile length. (3 refs.) 9. Yannawa wastewater treatment plant (Bangkok, Thailand): Design, construction and operation Abstract: Yannawa. Wastewater Treatment plant (Phase 1) serves a population equivalent of 500,000 and is located on a restricted site within the city of Bangkok, Thailand. Secondary treatment is based on the CASS? sequencing batch reactor (SBR) process and the plant is one of the largest multi-storey SBRs in the world. The limitation of available site area, the ground conditions and the characteristics of the wastewater to be treated set a series of challenges for the designers, contractors and commissioning and operational staff. This paper briefly describes the collection system, the process selection and the treatment streams of the wastewater treatment plant. The SBR secondary treatment plant is described in more detail. The problems that arose during commissioning and operation and the solutions made possible by the use of an SBR type of process are discussed. Details of plant performance during performance testing and during the first three years of plant operation are provided. ? Earth Tech Engineering Ltd 2004. (6 refs.) 真的很著急 那位高手能幫幫忙啊 謝謝了 [ Last edited by 十一月臭盆 on 2012-4-14 at 11:20 ] |
銀蟲 (正式寫手)
|
9. .Yannawa 污水處理廠(曼谷,泰國)的設(shè)計、結(jié)構(gòu)及運行 摘要:Yannawa 污水處理廠是一家能處理相當于500000人口排放污水的污水處理廠,該廠坐落在泰國曼谷城一個有限的區(qū)域。2級污水處理建于CASS序列組反應器(SBR)程序基礎(chǔ)上,Yannawa 污水處理廠是世界最大的多層序列組反應器(SBRs)的污水處理廠之一。受區(qū)域內(nèi)可用面積的局限,以及地面條件和所處理的污水特性,該廠設(shè)計人員、承建商以及試車和操作人員都曾面臨著各種各樣的挑戰(zhàn)。本文概括性敘述了該污水處理廠的收集系統(tǒng)、選擇程序及污水處理機組,詳細地介紹SBR 2級處理設(shè)備,對試運轉(zhuǎn)和運轉(zhuǎn)以及使用SBR類型的程序待解決的問題進行了討論。提供了設(shè)備測試及運轉(zhuǎn)的開始3年中的詳細性能參數(shù)。Earth Tech Engineering Ltd(全球工程技術(shù)有限公司) 2004. (參考6.) |

銀蟲 (正式寫手)
|
7.《污水處理廠的設(shè)計結(jié)構(gòu)研究進展》 摘要:荷蘭最大的城市污水處理廠是位于海牙的WWTP Houtrust.該廠具有處理相當于100000人口排放廢水的能力,占地僅5公頃。受地域限制,該廠僅建有三級連續(xù)的處理設(shè)施,用作現(xiàn)存的污水初期沉降處理廠的后續(xù)處理設(shè)施。本文主要敘述2級污水及淤泥處理設(shè)施的設(shè)計與構(gòu)造。使用Union Carbide及后來的Linde公司開發(fā)的一種經(jīng)過了充分實踐的先進處理系統(tǒng)——UNOX系統(tǒng)。該系統(tǒng)通過加入純氧,使活性污泥具有相當不錯的沉淀性質(zhì)。1986年開始建造使用該UNOX系統(tǒng)的污水沉降處理廠后續(xù)處理設(shè)施,并預計到1988年底完成。 |

| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 275求調(diào)劑 +10 | Micky11223 2026-03-25 | 14/700 |
|
|---|---|---|---|---|
|
[考研] 0856求調(diào)劑 +11 | zhn03 2026-03-25 | 12/600 |
|
|
[考研] 085602 307分 求調(diào)劑 +7 | 不知道叫什么! 2026-03-26 | 7/350 |
|
|
[材料工程] 一志愿C9材料與化工專業(yè)總分300求調(diào)劑 +8 | 曼111 2026-03-24 | 9/450 |
|
|
[考研] 求調(diào)劑 +4 | 零八# 2026-03-27 | 4/200 |
|
|
[考研] 材料與化工085600,總分304,本科有兩篇sci參與,求調(diào)劑 +10 | 幸運的醬醬 2026-03-22 | 12/600 |
|
|
[考研] 一志愿北京化工大學材料與化工 264分各科過A區(qū)國家線 +10 | 哈哈157349 2026-03-21 | 10/500 |
|
|
[考研] 考研調(diào)劑 +10 | 呼呼?~+123456 2026-03-24 | 10/500 |
|
|
[考研] 292求調(diào)劑 +4 | 求求了收下我吧?/a> 2026-03-26 | 4/200 |
|
|
[考研] 一志愿吉大071010,316分求調(diào)劑 +3 | xgbiknn 2026-03-27 | 3/150 |
|
|
[考研] 341求調(diào)劑 +7 | 青檸檬1 2026-03-26 | 7/350 |
|
|
[考研] 求調(diào)劑 一志愿 本科 北科大 化學 343 +6 | 13831862839 2026-03-24 | 7/350 |
|
|
[考研] 一志愿河工大 081700 276求調(diào)劑 +4 | 地球繞著太陽轉(zhuǎn) 2026-03-23 | 4/200 |
|
|
[考研] 290分調(diào)劑求助 +3 | 吉祥止止陳 2026-03-25 | 3/150 |
|
|
[考研] 求調(diào)劑 +3 | 李李不服輸 2026-03-25 | 3/150 |
|
|
[考研] 318求調(diào)劑 +5 | plum李子 2026-03-21 | 8/400 |
|
|
[考研] 生物學學碩求調(diào)劑 +7 | 小羊睡著了? 2026-03-23 | 10/500 |
|
|
[考博] 26申博自薦 +3 | whh869393 2026-03-24 | 3/150 |
|
|
[考研] 接收2026碩士調(diào)劑(學碩+專碩) +4 | allen-yin 2026-03-23 | 6/300 |
|
|
[考研] 280分求調(diào)劑 一志愿085802 +4 | PUMPT 2026-03-22 | 7/350 |
|