| 9 | 1/1 | 返回列表 |
| 查看: 8816 | 回復(fù): 8 | ||
chenzhihao金蟲 (小有名氣)
|
[求助]
如何用英語介紹自己的專業(yè)
|
| 如何可以用詳細(xì)的介紹自己的專業(yè),尤其是一些常用的表達(dá)句型,盼各位大蝦的幫助! |
木蟲 (正式寫手)
|
谷歌上面搜索一下知名大學(xué)的相關(guān)專業(yè)介紹,看過會(huì)有幫助。例如麻省理工機(jī)械工程學(xué)院(MIT MechE)的例文: http://meche.mit.edu/prospective/wanttobemeche/ 如果想要更深入地介紹,可以參考學(xué)術(shù)論文的前言部分。 |

金蟲 (著名寫手)
|
http://wenku.baidu.com/view/f1fad0f47c1cfad6195fa710.html### 這個(gè)網(wǎng)上有關(guān)于采礦工程專業(yè)的介紹的中文及英文介紹的 采礦工程 mineral engineering; mining activity; mining engineering 采礦工程專業(yè)簡介 培養(yǎng)目標(biāo):本專業(yè)培養(yǎng)具備采礦工程師的基本能力,能在采礦領(lǐng)域等方面從事礦區(qū)開發(fā)規(guī)劃、礦山(露天、井下)設(shè)計(jì)、礦山安全技術(shù)及工程設(shè)計(jì)、監(jiān)察、生產(chǎn)技術(shù)管理科學(xué)研究的高等工程技術(shù)人才。 培養(yǎng)要求:本專業(yè)學(xué)生主要學(xué)習(xí)巖體工程力學(xué)、采礦及礦山安全及工程方面的基本理論和基本技術(shù),受到采礦工程師的基本訓(xùn)練,具有礦區(qū)規(guī)劃、礦山開采設(shè)計(jì)、巖層控制技術(shù)、礦山安全技術(shù)及工程設(shè)計(jì)方面的基本能力。 畢業(yè)生應(yīng)獲得以下幾方面的知識(shí)和能力: 1.掌握采礦學(xué)科的基本理論和基本知識(shí); 2.掌握礦區(qū)開發(fā)、礦井開采、巷道開拓的設(shè)計(jì)方法; 3.掌握礦山壓力及巖體工程監(jiān)測、礦井通風(fēng)與安全、礦山安全以及礦井災(zāi)害預(yù)防等技術(shù); 4.具有先進(jìn)的生產(chǎn)組織和技術(shù)管理基本能力以及新工藝、新技術(shù)研究和開發(fā)的初步能力; 5.熟悉國家有關(guān)采礦工業(yè)的基本方針、政策和法規(guī); 6. 掌握文獻(xiàn)檢索、資料查詢的基本方法,具有一定的科學(xué)研究和實(shí)際工作能力。 主干學(xué)科:礦業(yè)工程(一級(jí)學(xué)科,采礦工程為其二級(jí)學(xué)科) 主要課程:煤礦地質(zhì)學(xué)、巖體力學(xué)、礦山壓力及其控制、工程力學(xué)、采礦學(xué)、礦井通風(fēng)與安全、井巷工程、礦山測量學(xué)、電工與電子技術(shù)、礦山電工學(xué)、煤礦機(jī)械、企業(yè)管理、技術(shù)經(jīng)濟(jì)學(xué)等。 主要實(shí)踐性教學(xué)環(huán)節(jié):包括地質(zhì)實(shí)習(xí)、測量實(shí)習(xí)、采礦認(rèn)識(shí)實(shí)習(xí)、生產(chǎn)及畢業(yè)實(shí)習(xí)、計(jì)算機(jī)應(yīng)用及上機(jī)操作、課程設(shè)計(jì)(機(jī)械零件、采礦、礦井通風(fēng)與安全、煤礦供電設(shè)計(jì)等)、畢業(yè)設(shè)計(jì)。 修業(yè)年限:四年 授予學(xué)位:工學(xué)學(xué)士 相近專業(yè):采礦工程 石油工程 礦物加工工程 勘察技術(shù)與工程 資源勘察工程 地質(zhì)工程 礦物資源工程 油氣儲(chǔ)運(yùn)工程 煤及煤層氣工程 資源勘查工程 英文部分: 下一個(gè)補(bǔ)充 |

金蟲 (著名寫手)
| The professional aim at training Engineering and technical personnal owning the basical theory of solid deposits and mining methods,the quality of minging engineer ,the basical ablity to engage in the mining areas of mining and other aspect of development planning, mine design,mine safty technology and engineering design ,monitoring, scientific research,production technology management and so on! |

金蟲 (著名寫手)
| The student mianly study rock mechanics mine and mine safety of engineering aspects of the basical theory and basical techniques,develop the basical skills of mining design, strata control, mine safety technology ,Mining rock mass mechanics, the green mining technology and engineeing design。 |

金蟲 (著名寫手)

金蟲 (著名寫手)

金蟲 (著名寫手)
|
This is my graduation design a new ore mining the design. It includes laohutai mine field geology, develop, mining, transportation, improve ventilation, drainage and other aspects. The new design a ore mining mainly include the following parts: 1. Laohutai mine field. Mine geology, the geographical position, the basic situation of coal etc. 2. Mine field development of mineral reserves laohutai mine field, mine production ability and level of service period and the division of the location to determine flow, and mine, the economy is part of the project, the gielding extension, well The depot, cavern of lines and the bottom part of the yard by capacity calculation. 3 the gielding design and mining methods. Mainly introduces the design, exploitation of adopted technology and skills, and mining system gielding tunnels and a cavern gielding arrangement of the ground, and work system. 4, mine production. Transport of ascension, determination of ventilation. Drainage method and calculation and related equipment selection of frontal cavern arrangement, etc. In order to practice and put the four-year knowledge into real results, the actual situation of mine, I put forward various scheme and ideas. For example, the method of mining coal seam in mining inhibition In the process, the old top cyclical and other factors across under the influence of using the method of mining dig alley, maintenance and outburst. Besides, the design is a preliminary design, the design of the method Also, please problems existing in the correct. And the design adopts AUTOCAD2004 computer-aided design, reduces the drawing of the difficulties and increases the readability of drawings. Sincerely thank * * * teacher in design for me Seriously guidance, let I learned a lot, I'll continue to study hard, enrich himself. Thank you! Keywords: geology, deploitation, coal gas, ventilation and methods, drainage |

金蟲 (著名寫手)
|
The graduation project I do is to place a mine north of the new design of mine. It includes mine geology, card development, mining, transportation, upgrading ventilation, drainage and other aspects. North places a new ore mine design include the following: 1. Outlined in the mine field. Mine geological, geographical location, coal and other basic overview of the situation. 2. Mine mine mine field to open up the reserve mining, mine production capacity and length of service, as well as to determine the level of division, to determine the location of the shaft, compared with the economic part of the mine to determine the extension of the program, the division of the mining area, well Depot at the end of the line basis, chamber and the layout of the car through the bottom part of the computing capacity. 3. Mining area design and mining methods. Mainly taken in the design, production and technical skills, mining area and roadway layout extraction system and constitutes a mining area chamber of the mining area and the layout of the system. 4, to enhance mine production. Transportation. Ventilation. Drainage way and to determine the amount of equipment used in the calculation and selection of relevant chamber arrangement, and so on. In order to practice for four years and this knowledge into real results for North places the actual situation of a mine, I put forward a variety of programs and the exploitation of the idea. For example, longwall mining face in gently inclined coal mining The process of the roof off the cross-cyclical and other factors used goaf along the way mining, excavation and maintenance. In addition to this, I designed a simple preliminary design, design methods used in Also there is a certain problem, you criticized the teacher corrected. And the use of the design AUTOCAD2004-aided design to reduce the difficulties of drawing and to increase the readability of the drawings. *** Sincere gratitude to the teachers in the design to me Careful guidance, I learned a lot, I will continue to study hard and continue to enrich themselves. Thanks! |

| 9 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 一志愿太原理工安全工程300分,求調(diào)劑 +4 | 0857求調(diào)劑. 2026-03-24 | 5/250 |
|
|---|---|---|---|---|
|
[考研] 【求調(diào)劑】085601材料工程專碩 | 總分272 | +6 | 腳滑的守法公民 2026-03-27 | 6/300 |
|
|
[考研] 352分 化工與材料 +5 | 海納百川Ly 2026-03-27 | 5/250 |
|
|
[考研] 一志愿211院校 344分 東北農(nóng)業(yè)大學(xué)生物學(xué)學(xué)碩,求調(diào)劑 +5 | 丶風(fēng)雪夜歸人丶 2026-03-26 | 8/400 |
|
|
[考研] 化學(xué)調(diào)劑 +4 | 愛吃番茄的旭 2026-03-24 | 5/250 |
|
|
[考研] 307求調(diào)劑 +8 | 超級(jí)伊昂大王 2026-03-24 | 9/450 |
|
|
[考研] 334求調(diào)劑 +3 | 雨清天晴 2026-03-21 | 3/150 |
|
|
[考研] 329求調(diào)劑 +7 | 鈕恩雪 2026-03-25 | 7/350 |
|
|
[考研]
|
鐘llll 2026-03-26 | 4/200 |
|
|
[考研] 281求調(diào)劑 +3 | 亞克西good 2026-03-26 | 5/250 |
|
|
[考研]
|
平樂樂樂 2026-03-26 | 4/200 |
|
|
[考研] 352求調(diào)劑 +4 | 大米飯! 2026-03-22 | 4/200 |
|
|
[考研] 化學(xué)調(diào)劑一志愿上海交通大學(xué)336分-本科上海211 +4 | 小魚愛有機(jī) 2026-03-25 | 4/200 |
|
|
[考研] 303求調(diào)劑 +6 | 藍(lán)山月 2026-03-25 | 6/300 |
|
|
[考研] 26考研-291分-廈門大學(xué)(085601)-柔性電子學(xué)院材料工程專業(yè)求調(diào)劑 +3 | min3 2026-03-24 | 4/200 |
|
|
[考研] 282求調(diào)劑 +3 | wcq131415 2026-03-24 | 3/150 |
|
|
[考研] 293求調(diào)劑 +7 | 加一一九 2026-03-24 | 7/350 |
|
|
[考研] 一志愿山東大學(xué)藥學(xué)學(xué)碩求調(diào)劑 +3 | 開開心心沒煩惱 2026-03-23 | 4/200 |
|
|
[考研] 333求調(diào)劑 +3 | ALULU4408 2026-03-23 | 3/150 |
|
|
[考研] 308求調(diào)劑 +3 | 墨墨漠 2026-03-21 | 3/150 |
|