請問BWR中的壓力控制池系統(tǒng)中的drywell和wet well的一般翻譯是什么?
|
|
就是這個圖里的drywell和wet well(Torus) 是不是wet well(Torus)就是翻譯成壓力控制池 那drywell翻譯成什么?總不能是primary containment吧…… |
銀蟲 (小有名氣)
先復(fù)制下WIKI的解釋等有空在和樓主探討一下![]() In a BWR, the containment strategy is a bit different. A BWR's containment consists of a drywell where the reactor and associated cooling equipment is located and a wetwell. The drywell is much smaller than a PWR containment and plays a larger role. During the theoretical leakage design basis accident the reactor coolant flashes to steam in the drywell, pressurizing it rapidly. Vent pipes or tubes from the drywell direct the steam below the water level maintained in the wetwell (also known as a torus or suppression pool), condensing the steam, limiting the pressure ultimately reached. Both the drywell and the wetwell are enclosed by a secondary containment building, maintained at a slight sub-atmospheric or negative pressure during normal operation and refueling operations. The containment designs are referred to by the names Mark I, Mark II, and Mark III. The Mark I is the oldest, distinguished by a drywell containment which resembles an inverted lightbulb above the wetwell which is a steel torus containing water. The Mark II was used with late BWR-4 and BWR-5 reactors. It is called an "over-under" configuration with the drywell forming a truncated cone on a concrete slab. Below is a cylindrical suppression chamber made of concrete rather than just sheet metal. Both use a lighweight steel or concrete "secondary containment" over the top floor which is kept at a slight negative pressure so that air can be filtered. The top level is a large open space with an overhead crane suspended between the two long walls for moving heavy fuel caskets from the ground floor, and removing / replacing hardware from the reactor and reactor well. The reactor well can be flooded and is straddled by pools separated by gates on either side for storing reactor hardware normally placed above the fuel rods, and for fuel storage. A refueling platform has a specialized telescoping mast for lifting and lowering fuel rod assemblies with precision through the "cattle chute" to the reactor core area. |
金蟲 (初入文壇)
新蟲 (初入文壇)
| 4 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 一志愿北京化工大學(xué) 070300 學(xué)碩 336分 求調(diào)劑 +4 | vv迷 2026-03-22 | 4/200 |
|
|---|---|---|---|---|
|
[考研] 303求調(diào)劑 +5 | 安憶靈 2026-03-22 | 6/300 |
|
|
[考研] 384求調(diào)劑 +3 | 子系博 2026-03-22 | 4/200 |
|
|
[考研] 0805材料320求調(diào)劑 +3 | 深海物語 2026-03-20 | 3/150 |
|
|
[考研] 279求調(diào)劑 +5 | 紅衣隱官 2026-03-21 | 5/250 |
|
|
[考研] 材料學(xué)學(xué)碩080502 337求調(diào)劑-一志愿華中科技大學(xué) +4 | 順順順mr 2026-03-18 | 5/250 |
|
|
[考研] 一志愿山大07化學(xué) 332分 四六級已過 本科山東雙非 求調(diào)劑! +3 | 不想理你 2026-03-16 | 3/150 |
|
|
[考研] 085700資源與環(huán)境308求調(diào)劑 +12 | 墨墨漠 2026-03-18 | 13/650 |
|
|
[考研] 22408 344分 求調(diào)劑 一志愿 華電計算機技術(shù) +4 | solanXXX 2026-03-20 | 4/200 |
|
|
[考研] 308求調(diào)劑 +3 | 阿姐阿姐家啊 2026-03-18 | 3/150 |
|
|
[考研] 330求調(diào)劑 +4 | 小材化本科 2026-03-18 | 4/200 |
|
|
[考研] 329求調(diào)劑 +9 | 想上學(xué)吖吖 2026-03-19 | 9/450 |
|
|
[考研] 0817 化學(xué)工程 299分求調(diào)劑 有科研經(jīng)歷 有二區(qū)文章 +22 | rare12345 2026-03-18 | 22/1100 |
|
|
[考研] 一志愿西安交通大學(xué) 學(xué)碩 354求調(diào)劑211或者雙一流 +3 | 我想要讀研究生 2026-03-20 | 3/150 |
|
|
[考研] 求調(diào)劑 +3 | @taotao 2026-03-20 | 3/150 |
|
|
[考研] 環(huán)境工程調(diào)劑 +9 | 大可digkids 2026-03-16 | 9/450 |
|
|
[考研] 0856調(diào)劑,是學(xué)校就去 +8 | sllhht 2026-03-19 | 9/450 |
|
|
[考研] 求調(diào)劑 +3 | 暗涌afhb 2026-03-16 | 3/150 |
|
|
[考研] 收復(fù)試調(diào)劑生 +4 | 雨后秋荷 2026-03-18 | 4/200 |
|
|
[考研] 有沒有道鐵/土木的想調(diào)劑南林,給自己招師弟中~ +3 | TqlXswl 2026-03-16 | 7/350 |
|