| 5 | 1/1 | 返回列表 |
| 查看: 1716 | 回復(fù): 3 | ||
| 當(dāng)前只顯示滿足指定條件的回帖,點(diǎn)擊這里查看本話題的所有回帖 | ||
Double_z金蟲(chóng) (初入文壇)
|
[求助]
請(qǐng)問(wèn)BWR中的壓力控制池系統(tǒng)中的drywell和wet well的一般翻譯是什么?
|
|
|
就是這個(gè)圖里的drywell和wet well(Torus) 是不是wet well(Torus)就是翻譯成壓力控制池 那drywell翻譯成什么?總不能是primary containment吧…… |
金蟲(chóng) (初入文壇)
銀蟲(chóng) (小有名氣)
先復(fù)制下WIKI的解釋等有空在和樓主探討一下![]() In a BWR, the containment strategy is a bit different. A BWR's containment consists of a drywell where the reactor and associated cooling equipment is located and a wetwell. The drywell is much smaller than a PWR containment and plays a larger role. During the theoretical leakage design basis accident the reactor coolant flashes to steam in the drywell, pressurizing it rapidly. Vent pipes or tubes from the drywell direct the steam below the water level maintained in the wetwell (also known as a torus or suppression pool), condensing the steam, limiting the pressure ultimately reached. Both the drywell and the wetwell are enclosed by a secondary containment building, maintained at a slight sub-atmospheric or negative pressure during normal operation and refueling operations. The containment designs are referred to by the names Mark I, Mark II, and Mark III. The Mark I is the oldest, distinguished by a drywell containment which resembles an inverted lightbulb above the wetwell which is a steel torus containing water. The Mark II was used with late BWR-4 and BWR-5 reactors. It is called an "over-under" configuration with the drywell forming a truncated cone on a concrete slab. Below is a cylindrical suppression chamber made of concrete rather than just sheet metal. Both use a lighweight steel or concrete "secondary containment" over the top floor which is kept at a slight negative pressure so that air can be filtered. The top level is a large open space with an overhead crane suspended between the two long walls for moving heavy fuel caskets from the ground floor, and removing / replacing hardware from the reactor and reactor well. The reactor well can be flooded and is straddled by pools separated by gates on either side for storing reactor hardware normally placed above the fuel rods, and for fuel storage. A refueling platform has a specialized telescoping mast for lifting and lowering fuel rod assemblies with precision through the "cattle chute" to the reactor core area. |
新蟲(chóng) (初入文壇)
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 環(huán)境學(xué)碩288求調(diào)劑 +8 | 皮皮皮123456 2026-03-22 | 8/400 |
|
|---|---|---|---|---|
|
[考研] 306求0703調(diào)劑一志愿華中師范 +7 | 紙魚(yú)ly 2026-03-21 | 8/400 |
|
|
[考研] 一志愿211 初試270分 求調(diào)劑 +4 | 谷雨上岸 2026-03-23 | 5/250 |
|
|
[考研] 一志愿上海交大生物與醫(yī)藥專碩324分,求調(diào)劑 +5 | jiajunX 2026-03-22 | 5/250 |
|
|
[考研] 工科0856求調(diào)劑 +5 | 沐析汀汀 2026-03-21 | 5/250 |
|
|
[考研] 291求調(diào)劑 +5 | 孅華 2026-03-22 | 5/250 |
|
|
[考研] 石河子大學(xué)(211、雙一流)碩博研究生長(zhǎng)期招生公告 +3 | 李子目 2026-03-22 | 3/150 |
|
|
[考研] 307求調(diào)劑 +11 | 冷笙123 2026-03-17 | 11/550 |
|
|
[考研] 尋找調(diào)劑 +4 | 倔強(qiáng)芒? 2026-03-21 | 4/200 |
|
|
[考研] 260求調(diào)劑 +3 | 朱芷琳 2026-03-20 | 4/200 |
|
|
[考研] 311求調(diào)劑 +3 | 26研0 2026-03-20 | 3/150 |
|
|
[考研] 0856材料專碩353求調(diào)劑 +4 | NIFFFfff 2026-03-20 | 4/200 |
|
|
[考研] 286分人工智能專業(yè)請(qǐng)求調(diào)劑愿意跨考! +4 | lemonzzn 2026-03-17 | 8/400 |
|
|
[考研] 0703化學(xué)調(diào)劑 +4 | 妮妮ninicgb 2026-03-21 | 4/200 |
|
|
[考研] 278求調(diào)劑 +9 | 煙火先于春 2026-03-17 | 9/450 |
|
|
[考研] 268求調(diào)劑 +9 | 簡(jiǎn)單點(diǎn)0 2026-03-17 | 9/450 |
|
|
[考研] 085601調(diào)劑 358分 +3 | zzzzggh 2026-03-20 | 4/200 |
|
|
[考研] 二本跨考鄭大材料306英一數(shù)二 +3 | z1z2z3879 2026-03-17 | 3/150 |
|
|
[考研] 一志愿華南師大 070300(化學(xué))304分求調(diào)劑 +3 | 0703武芊慧雪304 2026-03-18 | 3/150 |
|
|
[考研] 材料考研調(diào)劑 +3 | xwt。 2026-03-19 | 3/150 |
|