| 4 | 1/1 | 返回列表 |
| 查看: 1715 | 回復(fù): 3 | |||
Double_z金蟲(chóng) (初入文壇)
|
[求助]
請(qǐng)問(wèn)BWR中的壓力控制池系統(tǒng)中的drywell和wet well的一般翻譯是什么?
|
|
就是這個(gè)圖里的drywell和wet well(Torus) 是不是wet well(Torus)就是翻譯成壓力控制池 那drywell翻譯成什么?總不能是primary containment吧…… |
銀蟲(chóng) (小有名氣)
先復(fù)制下WIKI的解釋等有空在和樓主探討一下![]() In a BWR, the containment strategy is a bit different. A BWR's containment consists of a drywell where the reactor and associated cooling equipment is located and a wetwell. The drywell is much smaller than a PWR containment and plays a larger role. During the theoretical leakage design basis accident the reactor coolant flashes to steam in the drywell, pressurizing it rapidly. Vent pipes or tubes from the drywell direct the steam below the water level maintained in the wetwell (also known as a torus or suppression pool), condensing the steam, limiting the pressure ultimately reached. Both the drywell and the wetwell are enclosed by a secondary containment building, maintained at a slight sub-atmospheric or negative pressure during normal operation and refueling operations. The containment designs are referred to by the names Mark I, Mark II, and Mark III. The Mark I is the oldest, distinguished by a drywell containment which resembles an inverted lightbulb above the wetwell which is a steel torus containing water. The Mark II was used with late BWR-4 and BWR-5 reactors. It is called an "over-under" configuration with the drywell forming a truncated cone on a concrete slab. Below is a cylindrical suppression chamber made of concrete rather than just sheet metal. Both use a lighweight steel or concrete "secondary containment" over the top floor which is kept at a slight negative pressure so that air can be filtered. The top level is a large open space with an overhead crane suspended between the two long walls for moving heavy fuel caskets from the ground floor, and removing / replacing hardware from the reactor and reactor well. The reactor well can be flooded and is straddled by pools separated by gates on either side for storing reactor hardware normally placed above the fuel rods, and for fuel storage. A refueling platform has a specialized telescoping mast for lifting and lowering fuel rod assemblies with precision through the "cattle chute" to the reactor core area. |
金蟲(chóng) (初入文壇)
新蟲(chóng) (初入文壇)
| 4 | 1/1 | 返回列表 |
| 最具人氣熱帖推薦 [查看全部] | 作者 | 回/看 | 最后發(fā)表 | |
|---|---|---|---|---|
|
[考研] 284求調(diào)劑 +10 | Zhao anqi 2026-03-22 | 10/500 |
|
|---|---|---|---|---|
|
[考研] 284求調(diào)劑 +3 | yanzhixue111 2026-03-23 | 6/300 |
|
|
[考研] 一志愿211 初試270分 求調(diào)劑 +4 | 谷雨上岸 2026-03-23 | 5/250 |
|
|
[考研] 一志愿南航材料專317分求調(diào)劑 +3 | 炸呀炸呀炸薯?xiàng)l 2026-03-23 | 3/150 |
|
|
[考研] 291 求調(diào)劑 +4 | 化工2026屆畢業(yè)?/a> 2026-03-21 | 5/250 |
|
|
[考研] 招08考數(shù)學(xué) +6 | laoshidan 2026-03-20 | 14/700 |
|
|
[考研] 308求調(diào)劑 +3 | 墨墨漠 2026-03-21 | 3/150 |
|
|
[考研] 一志愿 西北大學(xué) ,070300化學(xué)學(xué)碩,總分287,雙非一本,求調(diào)劑。 +3 | 晨昏線與星海 2026-03-20 | 3/150 |
|
|
[考研] 初試 317 +7 | 半拉月丙 2026-03-20 | 7/350 |
|
|
[考研] 一志愿南大,0703化學(xué),分?jǐn)?shù)336,求調(diào)劑 +3 | 收到VS 2026-03-21 | 3/150 |
|
|
[考研] 0703化學(xué)調(diào)劑 +4 | 妮妮ninicgb 2026-03-21 | 4/200 |
|
|
[考研] 一志愿深大,0703化學(xué),總分302,求調(diào)劑 +4 | 七月-七七 2026-03-21 | 4/200 |
|
|
[考研] 材料學(xué)碩333求調(diào)劑 +3 | 北道巷 2026-03-18 | 3/150 |
|
|
[考研] 083200學(xué)碩321分一志愿暨南大學(xué)求調(diào)劑 +3 | innocenceF 2026-03-17 | 3/150 |
|
|
[考研] 332求調(diào)劑 +4 | ydfyh 2026-03-17 | 4/200 |
|
|
[考研] 一志愿武漢理工材料工程專碩調(diào)劑 +9 | Doleres 2026-03-19 | 9/450 |
|
|
[考研] 求調(diào)劑一志愿南京航空航天大學(xué)289分 +3 | @taotao 2026-03-19 | 3/150 |
|
|
[考博] 申博26年 +3 | 八6八68 2026-03-19 | 3/150 |
|
|
[考研] 材料考研調(diào)劑 +3 | xwt。 2026-03-19 | 3/150 |
|
|
[考研] 收復(fù)試調(diào)劑生 +4 | 雨后秋荷 2026-03-18 | 4/200 |
|